Central Government Responsibility in Mitigating the Impact of Cieunteung Retention Pond Development in Bandung Regency: A Causative Analysis

##plugins.pubIds.doi.readerDisplayName##: https://doi.org/10.33701/jtp.v16i2.4708
Keywords: Cieunteung Retention Pond, BBWS Citarum, Flood Control Infrastructure, Spiro, Responsibility as Cause

Abstract

The Cieunteung Retention Pond was constructed in 2015 and completed in 2018 by the central government through BBWS Citarum. Despite this, flooding in Dayeuhkolot and its surrounding areas in Bandung Regency has continued to occur sporadically between 2020 and 2021. This study aims to analyze and describe the government's responsibility, particularly BBWS Citarum, based on J. Spiro's theory of Responsibility. In this theory, Spiro outlines three aspects that influence responsibility, with this research focusing on discussing the issues within the aspect of responsibility as cause. The research uses a qualitative method with data presented descriptively. The findings indicate that BBWS Citarum has successfully met the construction targets but has yet to address new problems that have arisen post-construction due to several factors

Downloads

Download data is not yet available.
Published
2024-12-27
How to Cite
Sholihah, S., Saefulrahman, I., & Akbar, I. (2024). Central Government Responsibility in Mitigating the Impact of Cieunteung Retention Pond Development in Bandung Regency: A Causative Analysis. TRANSFORMASI: Jurnal Manajemen Pemerintahan, 16(2), 122-137. https://doi.org/10.33701/jtp.v16i2.4708